Hydropower study

Master Plan of
Hydropower Study Development in Indonesia

MAIN REPORT

 

 

Table of Contents

ABBREVIATIONS
CHAPTER 1 INTRODUCTION
1.1 Background of the Study
1.2 Objectives of the Study
1.3 Study Area
1.4 Counterpart Agencies
CHAPTER 2 LAWS AND REGULATIONS, POLICIES AND ORIGINIZATIONS
2.1 Indonesia Electricity Sector
2.1.1 Indonesia Electricity Sector Outlook
2.1.2 Policies and Plans for Economy and Industry
2.2 Laws, Regulations and Policies Related to Power Sector
2.2.1 General Socio-Economic Development
2.2.2 Energy Sector
2.2.3 Power Sector
2.3 Organizations
2.3.1 Government Authorities
2.3.2 PT PLN (persero)
2.3.3 Other Electricity Business Utilities
CHAPTER 3 POWER SYSTEM DEVELOPMENT PLAN
3.1 Current Status of Power System
3.1.1 Generation Facilities
3.1.2 Electricity Supply and Demand
3.2 Existing Power Development Plan
3.2.1 Overview
3.2.2 Demand Forecast
3.2.3 Generation Development Plan
3.3 Transmission Development Plan
3.3.1 Trends of Transmission Facilities
3.3.2 Current Transmission Development Plan
CHAPTER 4 BASIC DATA FOR HYDROPOWER PLANNING
4.1 Topography
4.2 Geology and Seismicity
4.2.1 Data Source
4.2.2 Preliminary Evaluation on Geology and Seismicity
4.3 Hydrology
4.3.1 Data Source
4.3.2 Preliminary Evaluation on Low Flow
4.4 Project Cost and Benefit
CHAPTER 5 ISSUES IN HYDROPOWER DEVELOPMENT
5.1 Introduction
5.2 Hydropower Projects Unrealized or Delayed
5.3 Institutional and Legal Issues in Hydropower Development
5.4 Institutional and Legal Framework to be Reinforced
CHAPTER 6 HYDROPOWER DEVELOPMENT MASTER PLAN
6.1 Target for Hydropower Development
6.1.1 Review of Recent Hydropower Development
6.1.2 Hydropower Projects in RUPTL
6.1.3 Hydro Potential and Hydro Capacity to be Developed
6.2 Development Scenarios
6.3 Project Classification
6.3.1 Framework of Project Classification
6.3.2 Natural and Social Environment
6.3.3 Other Criteria
6.3.4 Results of Screening
6.4 Inspection of Development Scenarios
6.4.1 Hydro Development along Each Scenario
6.4.2 Comparison among Scenarios
6.4.3 Conclusion
6.5 Hydro Development Master Plan
6.5.1 Basic Policies on Formulating Master Plan
6.5.2 Hydro Development Plan
6.6 Transmission Development Plan and System Analysis
6.6.1 Methodology
6.6.2 Transmission Development Plan and System Analysis
6.6.3 Preliminary Study for Pumped Storage Candidate in Sumatra Systen
CHAPTER 7 ENVIRONMENTAL AND SOCIAL CONSIDERATIONS
7.1 Introduction
7.2 Legal Framework of Environmental Administration
7.2.1 Environmental Administration
7.2.2 Environmental Protection and management Law (No. 32/2009)
7.2.3 Activities Needed to Conducted Environmental Impact Assessment
7.2.4 Environmental Impact Assessment (AMDAL)
7.3 Policy of Land Acquisition and Resettlement
7.3.1 Cultural Properties
7.3.2 Socially Vulnerable People
7.3.3 Land Acquisition and Resettlement
7.3.4 Consistency with JICA Guidelines
7.4 Stakeholder Meeting
7.5 Environmental and Social Consideration of IEE Level
7.5.1 General
7.5.2 Summary of the Master Plan
7.5.3 Environmental and Social Consideration
7.5.4 Discussion of Alternatives for Master Plan
7.6 Conclusion and Recommendation
CHAPTER 8 SELECTION OF PROJECTS FOR PRE F/S
8.1 Selection of Candidate Projects for Pre F/S
8.2 Status of Project Implementation
8.3 Natural and Social Environment
8.3.1 Key Points of Environmental Reconnaissance
8.3.2 Environmental Reconnaissance Result
8.4 Geology
8.4.1 General
8.4.2 Geological Reconnaissance
8.4.3 Geological Evaluation
8.5 Hydrology
8.5.1 Purpose of Hydrological Reconnaissance
8.5.2 Reconnaissance Result
8.5.3 Hydrological Evaluation
8.6 Topography
8.6.1 Purpose of Hydrological Reconnaissance
8.6.2 Reconnaissance Result
8.6.3 Topographical Evaluation
8.6 Access Road and Transmission Line
8.6.1 Access Road
8.6.2 Transmission Line
8.8 Selection of Projects for Pre F/S (2nd Screening)